In petroleum refining, a scheduled large-scale maintenance operation involves a lot of preparation, where many precautions are taken due to the risks involved. ENGlobal covers the entire turnaround process, managing all steps from start to finish, taking all precautions necessary to ensure a safe, accurate Technical Assessment Review (TAR).
ENGlobal utlizes Turnaround Scope Documents (TSDs) for all turnaround management projects. A TSD is a template that has been developed for a respective type of equipment, stating the unique turnaround work tasks required for that specific piece of equipment, as well as all ancillary requirements for the equipment (construction tools and equipment, materials, etc.) A TSD includes all safety requirements for the specific equipment, that has been developed over the past 10 years, which is continually improved after each review.
ENGlobal’s Turnaround Management Process:
ENGlobal develops a turnaround cycle based on a client’s business goals, capital plans, operations, reliability, and mechanical integrity needs.
ENGlobal establishes a basis for the procedure with a contract strategy and execution strategy.
ENGlobal begins scoping the work plan, scheduling the estimate, ordering the materials and assembling the bid packages.
| |
Turnaround Execution |
|
|
| |
• |
Pre-TAR |
|
|
| |
|
• |
Mobilizes all resources |
|
|
| |
|
• |
Stages utilized materials |
|
|
| |
|
• |
Pre-assembly |
|
|
| |
|
|
|
|
|
| |
• |
TAR |
|
|
| |
|
• |
Decommissions the unit |
|
|
| |
|
• |
Completes all TAR procedures |
|
|
| |
|
• |
Re-commissions the unit |
|
|
| |
|
• |
Start-up |
|
|
| |
|
|
|
|
|
| |
• |
Post-TAR |
|
|
| |
|
• |
Demobilizes |
|
|
| |
|
• |
Documents the project |
|
|
| |
|
• |
Benchmarks the project |
|
|
ENGlobal then evaluates and begins the next TAR process.
ENGlobal establishes goals and technology for the next TAR
Turnaround Scope Documents (TSD) Workflow Overview
|